Search
 
SCRIPT & CODE EXAMPLE
 

PYTHON

set change order python

>>> a = [1, 2, 20, 6, 210]
>>> b = set([6, 20, 1])
>>> [x for x in a if x not in b]
[2, 210]
Comment

PREVIOUS NEXT
Code Example
Python :: tkinter trig calculator 
Python :: how to download feature engine in spyder console 
Python :: df.write using another delimiter 
Python :: raise keyerror(key) from none os.environ 
Python :: django create ap 
Python :: Python 2.7 to 3.x Linux 
Python :: limiting a for each loop python 
Python :: dataframe from function 
Python :: python save base64 temp file 
Python :: how to bubble search in python stack overflow 
Python :: django how to create superuser if does not exists on migration 
Python :: ROC plot for h2o package 
Python :: rolingmean python 
Python :: glob.iglob sort path 
Python :: pandas select rows by condition in list 
Python :: python send email with attachment 
Python :: disable json dumps encode 
Python :: @action(detail=true) meaning 
Python :: python copy virtual env modules 
Python :: jupyter early exit cell 
Python :: pandas melt and stack 
Python :: sorting dictionary in python 
Python :: Start Django Project At http://127.0.0.1:8080/ 
Python :: Reverse Bits Algo 
Python :: rmtree (remove tree) example 
Python :: how to check columns with the numerical values 
Python :: symmetric_difference_update() Function of sets in python 
Python :: pygame lerp 
Python :: loop through KeyedVectors 
Python :: how to set notepad ++ for run python 
ADD CONTENT
Topic
Content
Source link
Name
9+4 =